PH and Temperature Adjustment Project

Manufacturing Construction Companies
Scope of work included:
  • Excavated and poured containment structure with a 10-ft deep well
  • Rerouted exiting influent and effluent piping with two 18,000-gallon batch reactor tanks
  • Installed new 360 gpm recirculating/effluent pumps
  • Installed new 300 gpm suction pumps, associated chemical feed piping and electrical components