Manufacturing Facility

Manufacturing Facility


  • New 26,000 SF addition with men’s and ladies’ locker rooms and exercise area in the lower level and a 10,000 SF product testing lab on the 2nd floor.
  • Langston was the general contractor managing the complete project.
  • The owner supplied all lab equipment and electrical. All other contractors were under contract to Langston included:
    • HVAC
    • Plumbing
    • Drywall
    • Painting
    • Flooring