The Scope of Work Included:

  • Demolition of the Existing Space Approximately 5000 Square Feet including Original Lab Area  Equipment, HVAC, Electrical, Selected Interior Partitions, VCT Flooring, Plumbing and  Modifications of Floor Drains.
  • New Construction included Modification of the Existing HVAC Ductwork, Sprinkler System and Electrical Upgrade.
  • New Steel Stud Framing Faced with Gypsum Board and   Altro Whiterock Hygienic Wall System.
  • New Ceilings and Restec Acrylic Floor Finish.
  • Installation of Dorma Automatic Doors, Numerous Stainless Steel Fixtures Installed Related to Manufacturing.
  • Installation of Stainless Steel Corners and Base throughout all Areas.