Industrial Pre-Treatment Facility

Industrial Pre-Treatment Facility


Construction of New 500,000 gallon/ day pre-treatment facility Included:

  • New HDPE Secondary containment liner for leak detection.
  • New concrete equalization and aeration tanks
  • New Fiberglass Tanks
  • Pumps/Eqt. Installation
  • New Concrete Clarifier
  • Intake Lines, Stainless Steel Process Piping
  • Instrumentation and Controls
  • Pre-Engineered Metal Building Erection
  • Architectural Finishes in New Lab
  • Site Work
  • Structural Steel Pipe Bridge from Manufacturing Facility to Pre-Treatment Site
  • Misc. Steel Erection for Platforms/Stairs
  • Additional Carboline Liner System in concrete tanks for leak protection
  • Sitework/Storm Drainage/Asphalt Paving.

Project Photos

Associations and Affiliations