  • This project consisted of the installation of 90,000 gallon below grade cast in place concrete tank inside an existing facility.
  • A piling system was installed to support the existing clear span structural columns as well as a soil nailing system to support the soils to allow for excavation.
  • A structural grating and handrail system was placed to allow for material assembly above grade and penetrations in the grating for material submersion while meeting OSHA standards.
  • The finished tank walls were coated with a painting system and an underwater lighting system was also installed for display illumination.
  • The final phase of the project consisted of the mechanical piping, pumps, controls, and instrumentation installation.